
+8615305276666
Include :
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe & coupler system)
(2) scaffolding pipes, hop dipped galvanized/ black. BS1139, STK500
(3) steel coupler (pressed / drop forged coupler)
(4) steel plank with hooks or without hooks
(5) steel stair case
(6) screw adjustable base jack
(7) adjustable props
(8) scaffolding gate
(9) Others
Really competitive ! Our company are near the origin of steel and we have big order amount, so we get relatively cheaper price of steel raw material ; low labor cost and near Shanghai sea port are also our advantages. And the most of all, "less profit but big turnover " is our perpetual business principle.
Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast
Our company has a strong technician team. Upon receiving the drawings provided by the customers, we will discuss with our technicians to study the feasibility of new moulds of production facilities. If the quantity is considerable, we can fully meet customers’ specifications.
You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
Shougang and TPCO etc.
Not sure, Our 100+ customers are from 30+ countries, including Malaysia , Thailand, Singapore, Australia, Poland, Italy, Korea, USA, UK, UAE etc, Just contact us to confirm and experience our service and product directly.
Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
We are the manufacturer of SCAFFOLDINGS MATERIALS for decade years. Scaffolding Business covers every scaffolding System and products.
SGS Test Report.
TUV Test Report
1) Only qualified raw material with certification is acceptable.
2) Quality check is operated by hand.
3) Free samples are always available.
4) Once quality problems occur, just sent us pics for confirmation, once confirmed, money or goods will be given as compensation.
We have made the flaw detection test which can prove the good welding quality.
Quality is priority. We follow the ISO system for all quality management.
1) We pack the scaffolding with Steel Pallet, let the customer to unload by forklift, in order to save the labor cost.
2) Other special requirements can be discussed by both.
Transport: BY Sea, BY courier, FCL, LCL.
1) We accept the payment by T/T, 30% of invoice value as deposit, 70% balance paid before shipment, and some others.
2) L/C are also acceptable
3) Others can be discussed if needed.
EXW, FOB, CFR and CIF etc.
1) Couplers in Nanjing.
2) Tube, Planks, Props in Tianjin.
3) Others can be offered if needed.
It depends on order quantity. Generally, the delivery time will be within 15 to 25 days.
Our professional team could send you quotations within 24 hours while receiving your inquiry.